Issue/ Case
When creating a project with a project stock and a BOM (or boms) are added with double article lines, they are merged in the MRQ screen and then cannot be added to project stock in the PO lines. Even though it is for the same project.
Versie/ Version
23.2.3
Stappenplan/ Steps
preparation
Have an article
Have a BOM with 2 lines of the same article and 1 line with another article
Create a project - fill in the client and the project group - save.
Go to the set-up tab
Add an activity under the project by clicking richtmousklick - add under
add the BOM with 2 lines of the same article and 1 line with a difirent article and release the material (see screenshot_2)
select the MRQ, merge all the lines and distribute automatically, make sure the articles are ordered from the same supplier (so they generate in 1 PO) (see screenshot_1)
Order the material.
Go to the PO the tick-box of the project stock is greyed out. This is also nog available after checking the tickbox in the project. (see screenshot_3)
Work-around/ Work-around
tick the projectstock on in the receipts.
or do not merge the article lines (which gives a large amount of order lines)
Gewenste oplossing/ Expected solution
Make the check for project stock less stern. Now it checks if 1 orderline has 1 group order then project_stock = Y otherwise = N
please add to the check to look into the particle and see if the planning_key and article_key als the same for several particle_keys so merged articles from 1 project can still go to the project stock in the orderline (and therefore is filled automatically in the receipt lines)
Toegevoegd aan de 23.4.1 versie die in november verschijnt.
Miranda, kun je hier iets meer over zeggen? Ik begrijp niet precies wat je bedoelt.